RILEY HOSPITAL IPD

Owner: IU Health Partners

Scope: Electrical & Systems Integrated Project Delivery

Completion: 2013

 

ERMCO, Inc. was awarded the contract for the electrical and systems work on Riley Hospital, which included the build-out of balance of the 10-story 650,000 square-foot tower that will include a NICU, PICU, Cancer, Burn, Heart, OR, ED, and Sterile Processing departments.

 

This project was completed using a true Integrated Project Delivery method. Unlike the design-build project delivery method which places the contractor in the leading role on a building project, IPD represents a return to the “Master Builder” concept where the entire building team including the owner, architect, general contractor, building engineers, fabricators and subcontractors work collaboratively throughout the construction process.

 

ERMCO was responsible for the entire electrical and low voltage systems installation including the power distribution, branch power and lighting, nurse calls, P.A. systems and HVAC control as well as the Building Management System. Many members of the ERMCO team were involved in the project at all levels. 

Show More

Proud Member of the

Corporate Headquarters: 1625 W Thompson Rd, Indianapolis, IN 46217

317.780.2923 p / 317.780.2853 f

TWP_Indy_Portrait_2019_AW.png
CCS Crystal Eagle 2018 Badge

Copyright (c) 2016 ERMCO, Inc. All Rights Reserved

Follow Us!